Guangzhou South Railway Station Engineering Introduction-PROJECTS-Guangzhou Reliance Hardware Co., Ltd
  • pg电子娱乐平台(中国)官方网站

    Whatsapp:0086 136 024 963 76

    PROJECTS

    Guangzhou South Railway Station Engineering Introduction

      Guangzhou south railway station was started in December 2004 and put into operation in January 2010.As of January 2010, the total construction area of Guangzhou south railway station is 615000 square meters, and the station building area is 486000 square meters,Guangzhou south railway station, with its magnificent appearance and distinctive Lingnan cultural features, is a landmark building that shows the perfect combination of Guangzhou's historical charm and modern atmosphere.Its structural layout and traffic guidance are more scientific than the railway station and the east railway station. There are suspension bridges on the East and west sides for vehicles to directly drive on the departure platform for passengers. Its three-dimensional traffic mode is similar to the design style of the airport.

    Guangzhou South Railway Station Engineering Introduction

      The glass door of Guangzhou South Railway Station adopts GCA-27 stainless steel 304 glass door clip seven character clip top clip of Lelang Hardware Co., Ltd. the glass door clip products of Lelang hardware are still selected for Guangzhou south railway station with a daily passenger flow of hundreds of thousands. It can be seen that the quality of the products and the reputation of the company's brand.

    Guangzhou South Railway Station Engineering Introduction

    Guangzhou South Railway Station Engineering Introduction

    Guangzhou South Railway Station Engineering Introduction

    Guangzhou South Railway Station Engineering Introduction

    Copyright © 2018 Guangzhou Reliance Hardware Co., Ltd All Rights Reserved.

    Technical Support:LIYANG  

    Tencent Weibo  Sina Weibo

    友情链接: